激情亚洲五月天视频_性爱Av片在线观看_一本无码av中文出轨人妻一区_国产呦萝免费视频

News

News

Home| News| News

Chinese first 8MW wind power cable and wire harness solution was successfully delivered

2019-7-4 1914 Font size:

On June 30, the delivery ceremony of Chinese first 8MW wind power cable and wire harness solution was held in Hengtong. This was the first time that the whole solution of high-power 8MW wind power cables and wire harnesses in the wind power industry has been delivered and used in China.

The solution delivered to customers is 8MW offshore high-capacity, high-power units and cables, which can meet the characteristics of long-term service of wind power cables and continuous torsion of wind turbines. The cables have good torsional structure design, high mechanical strength, vibration resistant, oil resistant, hydrochloric acid corrosion resistance and many other properties, so that it can operate at sea for long term and lay freely in the air.

The succeed of deliver the solution of 8MW wind power cables and harnesses is an important manifestation of the company's development strategy. At the same time, Hengtong will persisitently promote its marine strategy and contribute to the development of wind power industry.